8×10 Shed Plans (Free): A Gable Storage Shed With Material List & PDF

Disclosure: Shed & Bench is reader-supported and may earn a commission from some products we recommend, at no extra cost to you. The free printable plan on this page contains no affiliate links. Read our affiliate disclosure.

Illustration of a wooden gable-roof storage shed with double doors in its long wall, for free 8x10 shed plans with a material list and printable PDF
Illustration

These free 8×10 shed plans are for an 8 ft x 10 ft gable-roof storage shed with 2×4 walls, a floor on treated skids, a 48-1/2-inch double door in the long wall, a window, and a 6-in-12 roof. You get a material list, step-by-step instructions, nine of our own drawings, and a free PDF with the full cut list. Every structural member is sized from a published table, and we show which one, so you or your building department can check the work.

Searching for “10×8 shed plans”? It’s the same footprint: 120 in. along the door wall and 96 in. deep.

Check your local code first. Your city or county building department, not this plan, sets permit rules, setbacks, height limits, snow and wind loads, and frost depth. Check with them before you buy materials.

Free printable plan (PDF). No email required.

One printable file with the materials list, the full cut list, key steps, and all nine diagrams.

8x10 gable shed overall dimensions: 120 in. long and 96 in. deep, 6-in-12 roof, double doors in the 10-ft wall
Tap to open full size

Plain-language safety note: This design isn’t engineered or load-tested. No engineer has reviewed it, and we haven’t load-tested a shed built from it. The sizing comes from the 2024 International Residential Code (IRC) tables and manufacturer instructions, using the design conditions stated below. Your local building department sets the permit rules, snow and wind loads, and frost depth where you live. Confirm them before you build, and resize the framing if your loads are higher than the ones used here.

Want a simpler first build or more room? See our 4×8 lean-to and 10×12 plans, or compare free shed plans by size.

What you’re building: the 8×10 design at a glance

A gable roof sheds rain and snow both ways and gives the most headroom down the middle. The ridge runs the 10-ft length, and the doors are in a 10-ft eave wall.

ItemSize
Floor (outside of framing)96 in. x 120 in. (8 ft x 10 ft)
Walls2×4 studs at 16 in. on center, 89-3/4 in. tall with plates
RoofGable, 6-in-12 slope; ridge runs the 10-ft length
Rafters2×6 at 16 in. on center, 12 in. eave overhangs, flush gable ends
Ceiling joists (rafter ties)2×6 at 16 in. on center, beside each rafter
Ridge2×8 ridge board, with ridge straps across each rafter pair
Door48-1/2 x 81-1/4 in. rough opening in the front wall, two 25-1/8 x 83-3/4 in. Z-frame leaves
Window24 x 24 in. rough opening in the back wall
Floor2×6 joists at 16 in. on center on three 2-ply 2×6 skids, 23/32 in. tongue-and-groove deck
Siding4×8 engineered wood panel siding, 96 in. tall on the walls
HeightAbout 117-3/4 in. from the floor deck to the top of the ridge framing; about 10.9 ft from the bottom of the skids to the top of the roof

All dimensions use actual lumber sizes: 2×4 = 1-1/2 x 3-1/2 in.; 2×6 = 1-1/2 x 5-1/2 in.; 2×8 = 1-1/2 x 7-1/4 in.; 1×4 = 3/4 x 3-1/2 in.

Why the walls are 89-3/4 in. tall: with the 6-1/4 in. floor frame, the siding runs exactly 96 in. from the bottom of the rim to the top of the wall, so one 8-ft panel covers it. Measure your siding panels before you frame: if they’re even slightly under 96 in., plan a joint at the top or buy 9-ft panels.

Full-length parts: the rims, plates, skids, and ridge are cut at the full 120 in., and the ceiling joists at 96 in. Pick boards that measure at least that long.

Who it suits: someone who has framed a deck or a small shed and has a helper for raising walls and setting the ridge. Plan on a few weekends (our estimate).

Tools: circular saw, drill/driver, framing hammer, speed and framing squares, chalk line, 4-ft level, jigsaw, tin snips, two stepladders, and safety glasses, hearing protection, gloves, and a dust mask.

What fits in an 8×10 shed

The floor is 80 sq ft and the door opening is 48-1/2 x 81-1/4 in.: room for a push mower, garden tools, a couple of bikes, and shelves on the gable walls. For a riding mower or a wide cart, measure it against the opening first. If it’s tight, the 10×12 plan has a 60-in. door.

Do you need a permit for an 8×10 shed?

An 8×10 shed has a floor area of 80 square feet. Two model codes set the most common limits:

  • The 2024 IRC, Section R105.2, exempts “one-story detached accessory structures, provided that the floor area does not exceed 200 square feet” from a building permit.
  • The 2024 International Building Code (IBC), Section 105.2, exempts “tool and storage sheds, playhouses and similar uses” where the floor area is not greater than 120 square feet.

At 80 sq ft, this shed is under both lines, but cities and counties amend them, and some measure at the roof line (about 100 sq ft here). Ask your building department whether you need a permit, how they measure, the setbacks, and the height limit (this shed is about 10.9 ft tall). Zoning and HOA rules apply even without a permit, and the IRC says an exemption doesn’t authorize work that violates the code.

Also get your ground snow load, design wind speed, and frost depth (IRC Table R301.2, filled in locally); the checks below use them. In the US, call 811 before you dig or drive anchors.

Site and foundation for an 8×10 shed

Pick a level, well-drained spot with room to open both doors and walk around the shed.

Option 1: gravel pad with treated skids on solid blocks (used in this plan)

  • Mark a pad 12 in. larger than the shed on every side (about 10 x 12 ft), the margin Suncast’s foundation guide uses. Suncast says to excavate, usually 4 to 6 in. (check local code), then fill with crushed gravel and compact it.
  • Set solid (not hollow) concrete blocks in three rows of 4 under the future skid lines, about 37-1/4 in. apart center to center, with one under each end of each skid. Use solid blocks at least 8 x 16 in. We recommend setting each block on a 16 x 16 in. concrete paver over the compacted gravel; on soft clay or fill, treat the pavers as required. Check soil and footing rules with your building department (IRC Table R401.4.1 lists presumptive soil bearing values, and soil below 1,500 psf needs a soils investigation).
  • Set the skids on the blocks, level and parallel, 46-1/2 in. apart center to center.
  • LP’s siding instructions require at least 6 in. between the siding and the grade. The siding starts at the bottom of the rim, on top of the 5-1/2 in. skids, so the blocks need to add at least 1/2 in. Shim only with treated or composite shims.

Option 2: concrete slab (or piers)

Footings below the frost line or a slab may be required locally (IRC R403). They need their own design, not included here.

Frost protection: check locally. The model 2024 IRC doesn’t require frost protection for a shed like this one. Section R403.1.4.1, Exception 1, says: “Protection of free-standing accessory structures with an area of 600 square feet (56 m2) or less, of light-frame construction, with an eave height of 10 feet (3048 mm) or less shall not be required.” This shed qualifies, with its eaves about 8-1/2 ft above grade. Your city or county can amend that rule and require footings, so ask.

Anchoring. Install at least one ground anchor at each corner, tied to the floor frame with the anchor maker’s hardware. American Earth Anchors says the number and placement depend on shed size and soil. Minute Man Products’ own guidelines say that where codes require anchoring to 90 mph wind standards, anchors should be at least 30 in. long with a tested holding capacity of at least 3,000 lb. Those are manufacturer recommendations, not IRC values (the IRC has no shed-anchor table), so ask your building department.

8x10 shed floor frame from above: three 2-ply 2x6 skids, nine 2x6 joists at 16 in. on center between 120 in. rims, and the block layout
Tap to open full size

How every structural member was sized

Each member lists its design condition and source table, so you can check it against your local loads.

Design conditions used throughout

  • Ground snow load: up to 70 psf (the highest column in the IRC rafter and header tables); roof live load 20 psf.
  • Wind: ultimate design wind speed below 140 mph in Exposure B or below 130 mph in Exposure C. (the range for the king studs in IRC Table R602.7.5; uplift table R802.11 covers up to 140 mph).
  • Lumber: No. 2 grade Douglas fir-larch, hem-fir, Southern pine, or spruce-pine-fir (check the grade stamp). Treated lumber for the skids and floor.
  • Building width 8 ft; framing at 16 in. on center.

If your loads are higher, use the AWC Span Options Calculator or ask your building department.

MemberSize usedDesign condition and tableAllowedThis shed
Rafters2×6 No. 2 at 16 in.IRC Table R802.4.1(7): 70 psf ground snow, 20 psf dead, ceiling not attached, L/1807 ft 5 in. (SP) to 8 ft 1 in. (DF-L), horizontal47-1/4 in. (3 ft 11-1/4 in.) wall to ridge
Rafter overhang12 in.IRC R802.7.1.1: notched cantilever24 in. max., 3-1/2 in. depth left at the birdsmouth12 in., about 3-15/16 in. left
Ridge board2×8IRC R802.3: 1 in. nominal min., at least as deep as the rafter’s cut end6-1/8 in. plumb cut needs more than a 2×67-1/4 in.
Ceiling joists (rafter ties)2×6 No. 2 at 16 in.IRC Table R802.5.1(2): attic with limited storage, 20 psf live, L/24012 ft 0 in. (SP) to 13 ft 0 in. (DF-L)89 in. (7 ft 5 in.) clear
Heel joints5-16d commonIRC Table R802.5.2(1): 5:12 row, 16 in. spacing, 12-ft span column3 / 3 / 4 / 5 nails at 20 / 30 / 50 / 70 psf5 nails
Ridge straps (instead of collar ties)1-1/4 in. x 20 ga strap at each rafter pairIRC R802.4.6: ridge straps may replace collar ties; at least 1-1/4 in. x 20 gage, three 10d common nails into the top edge of each rafter, closest nail at least 2-3/8 in. from the rafter end—7 straps, one per interior pair
Door header2-2×6IRC Table R602.7(1): roof and ceiling, 12-ft building width (the narrowest column)6-0 / 5-1 / 4-6 at 30 / 50 / 70 psf, 1 jack48-1/2 in. (4 ft 1/2 in.) opening
King studs at the door2 each sideIRC Table R602.7.5: openings over 4 ft use the 6-ft row (footnote a); 2 king studs below 140 mph Exposure B or 130 mph Exposure C22 each side
Window header2-2×6IRC Table R602.7(1), same column6-0 / 5-1 / 4-6 at 30 / 50 / 70 psf, 1 jack2 ft 0 in. opening, 1 king each side
Wall studs2×4 at 16 in.IRC Table R602.3(5): bearing wall, roof and ceiling only24 in. o.c., 10 ft height85-1/4 in. studs
Floor joists2×6 No. 2 at 16 in.IRC Table R502.3.1(2): 40 psf live, 10 psf dead, L/3609 ft 1 in. (HF) to 9 ft 9 in. (DF-L)About 43-1/2 in. clear between skids
Skids2-ply 2×6 treatedIRC Table R507.5(1) deck beams: 40 psf live, 10 psf dead, wet service; 10-ft joist column (see notes)IRC 2021: 5-4 (SP), 4-9 (DF-L/HF/SPF); IRC 2024: 6-5 (SP), 5-8 (DF-L/HF/SPF)Blocks about 37-1/4 in. apart
Rafter-to-wall tiesSimpson H2.5AUplift demand: IRC Table R802.11 (see “Wind and uplift”). Tie capacity: Simpson catalog p. 277 (manufacturer rating, not a code value)615 lb (SPF/HF), manufacturer rating201 lb max. at 130 mph, Exposure C (the plan’s wind range); 247 lb at 140 mph C

Notes on the table

  • Why 2×6 rafters, not 2×4: a 2×4 would pass the span check on a roof this small, but a birdsmouth in a 2×4 wouldn’t leave the 3-1/2 in. of depth that R802.7.1.1 requires for an overhang.
  • Why ceiling joists matter: IRC R802.2 requires continuous ties across the building so the rafters don’t push the walls apart. R802.5.2 accepts ceiling joists parallel to the rafters, in the bottom third of the rafter height, nailed per Table R802.5.2(1), and that lets the ridge be a plain board (R802.3).
  • Heel nails: there’s no 6:12 row, so we used the 5:12 row (a lower slope pushes harder, so it needs more nails). Its footnote allows 10d common nails at 1.2 times the count, rounded up (6).
  • Why ridge straps instead of collar ties: IRC R802.4.6 puts collar ties in the upper third of the attic space. On a roof this narrow, measured to the top of the ridge framing (about 28 in.), the upper third starts about 18-5/8 in. up, leaving about 2 in. under the ridge board: not enough for a 3-1/2 in. 1×4. R802.4.6 lets ridge straps replace collar ties, so this plan uses one over every interior rafter pair.
  • Gable-end rafters sit on gable studs, with the ridge ends on 2×4 posts. Footnote b of Table R802.5.2(1) drops the heel joint connection where the ridge is supported by a load-bearing wall, header, or ridge beam, so the end pairs get no ceiling joists.
  • Header table footnote: the 30 psf column also applies where the ground snow load is under 30 psf and the roof live load is 20 psf or less.
  • Header bracing: Table R602.7(1) footnote f assumes the header’s top is braced by perpendicular framing. Here it sits tight under the top plate, which carries the rafters and joists. Don’t add cripples above it.
  • King studs: Table R602.7.5 sets the number of full-height studs at each end of a header. The door opening is 48-1/2 in., just over 4 ft, and footnote a sends anything between rows to the next larger one (6 ft), which calls for 2 king studs at each end at the wind speeds above. The window’s 2-ft opening needs 1.
  • Floor joists have a large margin, which also covers the tables’ dry-lumber assumption. Joist ends bear 1-1/2 in. on the outer skids (IRC R502.6 minimum).
  • Skids are our adaptation. The IRC has no shed-skid table, so we used the deck beam table: the center skid carries about 4.8 ft of floor, so we read the 10-ft joist column. The deck table doesn’t cover the wall, roof, and snow loads on the outer skids, so have your building department confirm the block spacing before you build. Nail the plies with two rows of 10d (3 x 0.128 in.) nails 16 in. apart along each edge (R507.5), and give each skid end at least 3 in. of bearing (R507.5.1). The block spacing passes the 2021 and 2024 editions of Table R507.5(1); we checked it against the lower 2021 values (5-4 (SP), 4-9 (DF-L/HF/SPF)), since many places still use the 2021 IRC.
  • Floor load: 40 psf is the IRC’s live load for living areas and decks. Keep very heavy equipment near the skids, or have a pro size the floor for it.

Check these judgement calls with your building department. The skids, the 6:12 heel nailing, the ridge straps, and the gable-end rafters above use our reading of the closest IRC tables, not an engineer’s design. Show your building department this section, and follow its answer if it differs.

Section through the 8x10 shed roof: 2x6 rafters, 2x6 ceiling joist at the plates, 2x8 ridge, and a ridge strap over each rafter pair
Tap to open full size

Material list: how much lumber an 8×10 shed needs

Quantities include a spare rafter board. Buy extra 2x4s if you’re new to framing.

Foundation and floor

QtyMaterial
62×6 x 10 ft treated, rated for ground contact (6 plies of 120 in. for three 2-ply skids)
12solid concrete blocks, at least 8 x 16 in. (three rows of 4; see “Site and foundation”)
12concrete pavers, 16 x 16 in. (recommended, one under each block)
—Crushed gravel for a 10 x 12 ft pad (about 1.5 cubic yards at 4 in. deep) and landscape fabric
72×6 treated: 1 x 8 ft, 2 x 10 ft, 4 x 16 ft (2 rim joists of 120 in. and 9 floor joists of 93 in.)
323/32 in. APA Rated Sturd-I-Floor panels, span rating 24 oc, tongue-and-groove, 4 ft x 8 ft
—4 (minimum) ground anchors with cable and clamps, sized for your soil by the anchor maker

Wall framing

QtyMaterial
392×4 x 8 ft (studs, jacks, sill, cripples, gable studs, ridge posts)
62×4 x 10 ft (front and back wall plates)
42×4: 2 x 8 ft, 2 x 16 ft (gable-wall plates)
12×6 x 10 ft (door header, 2 plies)
12×6 x 8 ft (window header, 2 plies of 27 in.)
—1/2 in. plywood scraps for header spacers (from the roof sheathing offcuts)

Roof framing and roofing

QtyMaterial
102×6 No. 2 x 12 ft (18 rafters, 2 per board, plus a spare board)
72×6 No. 2 x 8 ft (ceiling joists)
12×8 No. 2 x 10 ft (ridge board)
7ridge straps, at least 1-1/4 in. wide and 20 gauge (for example Simpson Strong-Tie LSTA18, 1-1/4 x 18 in., 20 gauge), plus 10d common nails (3 x 0.148 in.)
515/32 in. or 1/2 in. APA Rated Sheathing, span rating 32/16, 4 ft x 8 ft
—Roofing underlayment for about 112 sq ft plus laps
—Drip edge, 5 pieces x 10 ft (about 42 linear ft of eaves and rakes, plus laps)
—Architectural asphalt shingles, 4 bundles (GAF says 3 bundles of Timberline HDZ cover 98.4 sq ft; this roof is about 112 sq ft, plus cutting waste), plus starter strip shingles for about 42 linear ft and hip-and-ridge cap shingles for 10 ft of ridge, per the shingle maker
—Roofing nails: IRC R905.2.5 calls for galvanized steel, stainless steel, aluminum, or copper roofing nails with a 12-gauge minimum shank and 3/8 in. minimum head, long enough to go through the sheathing (it’s thinner than 3/4 in.)
18Simpson Strong-Tie H2.5A hurricane ties, plus 180 – 0.131 x 2-1/2 in. nails (or Simpson SD9212 screws)

Siding, trim, doors, and window

QtyMaterial
124 ft x 8 ft panel siding sheets (this plan follows LP SmartSide Strand Substrate 76 Series panel instructions): 5 for the eave walls, 4 for the gable walls, 1 for the gable triangles, 2 for the door leaves
21×8 exterior trim x 10 ft (fascia)
41×6 exterior trim x 8 ft (rake boards)
131×4 exterior trim x 8 ft (8 corner boards, door rails and braces, astragal, window trim)
—Z-flashing, 4 pieces x 10 ft (gable joints, over the doors and window)
1clear polycarbonate sheet, 1/4 in., cut 26 x 26 in. (fixed window); or shed window whose rough opening fits the framing
6heavy-duty exterior T-hinges or strap hinges, 2 barrel bolts for the fixed leaf, a hasp or gate latch, 2 door pulls
—1/4 in. hardware cloth, small roll (for the open rafter bays above the walls)

Fasteners and finishing (nail sizes from IRC Table R602.3(1) unless noted; IRC R304.3.1 requires hot-dipped zinc-coated galvanized, stainless, silicon bronze, or copper fasteners in preservative-treated wood)

QtyMaterial
—16d common nails (3-1/2 x 0.162 in.), hot-dip galvanized for treated lumber, for framing and heel joints
—10d common nails (3 x 0.148 in.) for rafters, ridge straps, and toenailing
—10d nails (3 x 0.128 in.), hot-dip galvanized, for nailing the skid plies together (IRC R507.5)
—8d common nails (2-1/2 x 0.131 in.) for the floor deck, roof sheathing, and ceiling joist toenails; hot-dip galvanized for toenailing joists to skids
—Siding nails: 6d (0.113 in. shank) hot-dipped galvanized, long enough to go at least 1-1/2 in. into framing (LP’s minimum for 38 and 76 Series panels; not electroplated)
—1-5/8 in. exterior screws (trim, doors)
—Exterior sealant (LP calls for ASTM C920, Class 25 minimum), exterior primer and paint

Cut list

The full cut list is in the free PDF. Download the printable 8×10 shed plan (PDF) → It lists every part with its size, quantity, and notes.

Two rafters come out of each 12-ft 2×6 (each needs about 69 in. of board with its plumb cuts). Step 5 shows how to mark the pattern rafter; the PDF shows how the numbers are worked out.

Rafter pattern for the 8x10 shed: ridge plumb cut, heel line 52-13/16 in. from the long point, birdsmouth with a 1-3/4 in. plumb cut, and the tail cut
Tap to open full size

How much does it cost to build an 8×10 shed?

Prices vary by region and week, so we don’t print a total. Price the material list locally and add delivery and permit fees.

Want more weekend projects? TedsWoodworking is a paid online plan collection, and the seller says it bundles over 16,000 plans. It isn’t made by Shed & Bench.

Affiliate link: we may earn a commission if you buy, at no extra cost to you. Affiliate disclosure.

Browse TedsWoodworking plans →

Step 1: Build the skids and the floor

  • Nail each pair of 120-in. 2x6s face to face with two rows of 10d nails, 16 in. apart, along each edge (IRC R507.5). Set the three skids on edge on their blocks, one under each rim and one centered, and level them.
  • Mark both rims for joists at 16 in. on center: one flush at each end, then centered at 16, 32, 48 … 112 in.
  • Stand the rims on edge 96 in. apart outside to outside, set the 93-in. joists on the marks, and end-nail through the rim into each joist with three 16d common nails (IRC Table R602.3(1), item 27).
  • Square the frame (diagonals about 153-11/16 in.).
  • Set the frame on the skids. Toenail each joist to each skid with three 8d common nails (item 22). Attach the ground anchors.
  • Lay the deck with the long edges across the joists: a full sheet and a 24-in. piece in one row, a 48-in. and a 72-in. piece in the other, so the end joints land on joists and don’t line up. Nail with 8d common nails 6 in. apart at the panel edges and 12 in. at the intermediate joists (item 38). T&G panels cover a little under 48 in., so measure the rows; if they come up short, rip a filler strip.

Step 2: Frame the front wall with the double-door opening

  • Cut the plates (120, 120, and 113 in.), 9 studs at 85-1/4 in., two jack studs at 79-3/4 in., two 51-1/2-in. 2x6s, and a 5-1/2 x 51-1/2 in. plywood spacer.
  • Build the header: sandwich the spacer between the 2x6s and nail with 16d common nails 16 in. apart along each edge (item 10).
  • Mark the plates: end studs flush at each end; common studs centered at 16, 96, and 112 in.; two king studs on each side of the door, at 31-1/4 to 34-1/4 and 85-3/4 to 88-3/4 in. The jacks go just inside the inner kings (34-1/4 to 35-3/4 and 84-1/4 to 85-3/4 in.), leaving a 48-1/2-in. opening from 35-3/4 to 84-1/4 in.
  • Nail the end, common, and king studs between the bottom plate and the first top plate with two 16d common end nails per joint (item 17). Face-nail each pair of kings together, and each jack to its king, with 16d common nails 24 in. apart (item 8).
  • Set the header on the jacks, tight under the top plate, so the top plate braces the header’s top (Table R602.7(1) footnote f). That makes the opening 81-1/4 in. tall. End-nail through the inner king into each end of the header with three 16d common nails (item 12).
  • Square the wall, raise it onto the front edge of the deck, and nail the bottom plate down with 16d common nails 16 in. apart (item 15), except inside the door opening. Brace it plumb.
8x10 front wall framing: 48-1/2 in. door opening with a 2-2x6 header tight under the top plate, two king studs and one jack stud each side
Tap to open full size

Step 3: Frame the back wall with the window opening

  • Cut the plates, 9 studs at 85-1/4 in., two jacks at 79-3/4 in., two 27-in. 2×6 header pieces with a 5-1/2 x 27 in. spacer, a 24-in. flat sill, and two cripples at 54-1/4 in.
  • Mark the plates: end studs flush; common studs centered at 16, 32, 48, 96, and 112 in.; kings at 53 to 54-1/2 and 81-1/2 to 83 in.; jacks inside them; cripples centered at 60 and 76 in.
  • Assemble as in Step 2. Nail the sill flat on the cripples between the jacks, so the rough opening is 24 x 24 in. (56 to 80 in. along the wall), with its bottom 57-1/4 in. above the deck. If you buy a shed window, frame its rough opening instead; the 2-2×6 header covers openings up to 4 ft 6 in., but an opening over 4 ft needs a second king stud each side.
  • Raise the wall onto the back edge of the deck, nail it down, and brace it plumb.
8x10 back wall framing with a 24 x 24 in. window rough opening
Tap to open full size

Step 4: Frame the gable walls and tie the corners

  • For each gable wall, cut the bottom and top plates at 89 in., the upper top plate at 96 in., and 7 studs at 85-1/4 in.
  • Lay out studs at the ends and every 16 in. measured from the front corner of the building (16, 32, 48, 64, and 80 in.). That puts a stud under the siding joint and the ridge post at 48 in.
  • Assemble with two 16d end nails per joint, raise each wall between the eave walls, and nail the bottom plate down.
  • Face-nail the end studs to the eave-wall end studs with 16d common nails 16 in. apart (item 9).
  • Nail the 96-in. upper top plate on top so it laps onto the eave walls’ lower top plates, with 16d common nails 16 in. apart (item 13) and two 16d nails at each corner lap (item 18).
  • Plumb, square (diagonals within about 1/4 in.), and brace the walls.
8x10 gable wall and gable-end framing: studs at 16 in. on center, gable studs with long points 6-5/8 and 14-5/8 in., and a 20-3/4 in. ridge post
Tap to open full size

Step 5: Cut a pattern rafter and set the ridge

  • Mark the pattern. On a straight 2×6, mark a 6-in-12 plumb line at the top end (ridge cut). Measure 52-13/16 in. along the top edge and draw the heel plumb line. Draw the birdsmouth: a 3-1/2 in. level seat and a plumb cut about 1-3/4 in. deep. Measure another 13-7/16 in. along the top edge and mark the plumb tail cut.
  • Test it. With a 2×8 scrap as a stand-in ridge, its bottom edge should meet the inside corner of the top plate and its top edge the top of the ridge. Check both ends and the middle, then cut 18 rafters in total.
  • Lay out the top plates: end rafters flush with each end, the rest centered at 16, 32 … 112 in. (9 per side).
  • Raise the ridge. Toenail a 20-3/4 in. 2×4 post to the gable top plate at the center of each gable wall. With a helper on a second ladder, set the 120-in. 2×8 ridge on the posts and nail it down.
  • Set the rafters in opposing pairs so the ridge stays straight. At the ridge, use three 10d common toenails or two 16d common end nails per rafter (item 7). At the plates, toenail with two 10d common nails on one side (item 6 and its footnote, since each interior rafter gets a ceiling joist beside it; the four end rafters have no ceiling joist, so give each one a third 10d toenail on the opposite side); the ceiling joist gets its own toenails in Step 6.

Step 6: Ceiling joists, heel nailing, ridge straps, and hurricane ties

  • Clip the ceiling joists. At each end of the 7 ceiling joists (96-in. 2x6s), cut a 6-in-12 taper about 1-1/8 in. deep so the corner stays under the roof. IRC R802.7.1.2 limits ceiling joist taper cuts to one-fourth of the depth (1-3/8 in. for a 2×6).
  • Set one beside each interior rafter pair, on both eave-wall plates. Toenail each end to the plate with three 8d common nails (item 2).
  • Nail the heel joints: five 16d common nails through the ceiling joist into the rafter at each end (Table R802.5.2(1); see the sizing section).
  • Ridge straps: at each interior rafter pair, center a 1-1/4 x 18 in., 20-gauge strap (such as an LSTA18) over the ridge so it lies on the top edge of both rafters. Fill the holes as the strap maker’s instructions specify, with at least three 10d common nails into the top edge of each rafter and none closer than 2-3/8 in. to the rafter’s end (IRC R802.4.6). That means the nails go in holes at least 3-1/8 in. from the strap’s center; check the hole spacing on your strap before you buy enough for the whole roof. Do this before the sheathing goes on.
  • Hurricane ties: fasten a Simpson H2.5A at every rafter at both walls (18 total), on the inside face of the wall, on the side of each rafter away from its ceiling joist, with five 0.131 x 2-1/2 in. nails into the rafter and five into the plates. Simpson’s evaluation report allows the inside face (ICC-ES ESR-2613, Table 1, footnote 3), and it keeps the ties clear of the siding notches in Step 8.
  • Gable studs: cut each stud to fit between the gable top plate and the end rafter (long points 6-5/8 and 14-5/8 in.), and toenail with four 8d common nails at each end (item 17).

Wind and uplift

IRC Table R802.11 lists the uplift force on each rafter-to-wall connection. For rafters at 16 in. on center, a roof pitch of 5:12 or more, and its smallest span (12 ft; this roof is 8 ft), the forces are:

Wind speed (ultimate)Exposure BExposure C
110 mph57 lb117 lb
120 mph85 lb157 lb
130 mph117 lb201 lb
140 mph150 lb247 lb

Simpson’s catalog lists an allowable uplift of 615 lb per H2.5A tie in spruce-pine-fir/hem-fir (700 lb in Douglas fir/Southern pine), far above any of these. Those are manufacturer ratings, not code values. Simpson says its SD9212 screws give the same load; ordinary deck or drywall screws are not a substitute. The two king studs at the door assume wind below 140 mph in Exposure B or 130 mph in Exposure C (Table R602.7.5); above that, or in Exposure D, ask your building department.

LP says single nailing of its 76 Series panels meets wall bracing requirements, which is why this plan uses 76 Series.

Step 7: Roof sheathing, drip edge, and shingles

  • Sheathing. A 32/16 panel may span 28 in. without edge support (IRC Table R503.2.1.1(1)). Start at the eave with full-width sheets flush with the tails, strength axis across the rafters: a 96-in. sheet and a 24-in. piece per side. Rip the top course (about 19 in.) to meet at the ridge, with its end joint at 48 in. so it doesn’t line up with the one below. End joints land on rafters. APA recommends a 1/8 in. gap at panel edges and ends unless the panel maker says otherwise.
  • Nail it with 8d common nails (2-1/2 x 0.131 in.) 6 in. apart at the edges and 6 in. at every intermediate rafter (IRC Table R602.3(1), item 31). If your design wind speed is over 130 mph in Exposure B or over 110 mph in Exposure C, space the nails 4 in. apart at every rafter instead. On a roof this size, the table’s 48-in. edge and ridge zones cover the whole roof. Where your framing’s specific gravity is below 0.42, use RSRS-03 ring-shank nails (same footnotes).
  • Fascia. Snap a line across the tails, trim any that stick out, and nail on the 1×8 fascia (it covers the 6-1/8 in. plumb cut).
  • Drip edge and underlayment. IRC R905.2.8.5 requires drip edge at eaves and rakes of shingle roofs, lapped at least 2 in., extending at least 1/4 in. below the sheathing and 2 in. onto the deck, fastened at most 12 in. apart. Put the underlayment over the drip edge at the eaves and under it at the rakes. At 6 in 12, one layer of underlayment meets IRC R905.2.2; double underlayment is only required below 4 in 12.
  • Shingles. Follow the shingle maker’s instructions; GAF’s Timberline instructions call for starter strips at eaves and rakes, a 5-5/8 in. exposure, and four nails per shingle (the IRC R905.2.6 minimum). Cap the ridge.

Step 8: Siding, gable triangles, and trim

LP’s panel instructions call for studs at 16 in. on center at most; nails 6 in. apart at panel edges and 12 in. in the field, 3/8 in. from the edge and 1-1/2 in. into framing; 1/8 in. gaps at vertical joints and 3/16 in. at trim, sealed; 6 in. above grade and 1 in. above roofing; and primed, painted cut edges.

  • Notch the eave-wall panels first. Each rafter tail hangs about 2-1/16 in. below the top of the wall at the siding face, so a full-height panel would hit it. Mark the rafter positions on the top edge of each front and back panel and cut a notch about 1-5/8 in. wide and 2-1/8 in. deep at each one, then test-fit and trim. Seal the small gaps around the tails with exterior sealant, or cover them with the hardware cloth below.
  • Eave walls. Hang two 48 x 96 in. panels and a 24-in. rip per wall, from the bottom of the rim to the top of the wall.
  • Cut the door opening from inside with a jigsaw, along the jacks and the underside of the header, and saw out the bottom plate. Cut the window opening the same way.
  • Gable walls. Hang two full panels per wall, flush with the outside of the front and back walls. Their joint lands on the stud at 48 in.
  • Gable triangles. Cut the four triangle pieces (two per gable, each 48 in. wide) from one sheet, with sloped tops that meet the underside of the roof sheathing. LP shows a butt-and-flash horizontal joint: a 3/8 in. minimum gap over sloped flashing with a 4-in. vertical leg, backed by framing (here, the gable top plate). Install Z-flashing on top of the lower panels before hanging the triangles.
  • Trim. Add 1×4 corner boards and 1×6 rake boards. LP says trim must be thick enough that the siding doesn’t stick out past it.
  • Close the eaves. Staple 1/4 in. hardware cloth over the open spaces between rafters above the eave walls.
Eave detail for the 8x10 shed: each rafter tail drops below the top of the wall, so the siding panel is notched about 1-5/8 x 2-1/8 in. at every tail
Tap to open full size

Step 9: Build the double doors and the window

  • Cut two 25-1/8 x 83-3/4 in. leaves from siding panels.
  • Screw 22-1/8-in. 1×4 rails across the inside top and bottom of each leaf (inset 1-1/2 in. from the sides, 4 in. from the ends) and a diagonal brace between them, low end on the hinge side.
  • Hang each leaf with three hinges into the king and jack studs: 1 in. of overlap at the outer edges, tops 1-1/2 in. above the opening, a 1/4 in. gap between leaves.
  • Screw a 1×4 astragal down the outside edge of the active leaf to cover the gap. Add barrel bolts at the top and bottom of the fixed leaf, a latch, and pulls.
  • Window. Bed the polycarbonate sheet over the opening in exterior sealant and frame its edges with 1×4 trim. Fasten it as the sheet maker specifies. Add Z-flashing over the window trim and the door head trim; LP says all openings must be properly sealed or flashed.
Z-frame double doors for the 8x10 shed, inside face: two 25-1/8 x 83-3/4 in. leaves with rails, braces, and an astragal
Tap to open full size

Finishing your 8×10 shed

  • Prime and paint the siding, trim, and every cut edge. Seal trim joints, but leave the bottom edges of the siding open to drain.
  • Lay 1/2 in. plywood on the ceiling joists for light storage only (IRC Table R802.5.1(2), attics with limited storage). It isn’t a loft for people.
  • Keep at least 6 in. between the siding and the ground all the way around.

Setting up the inside? Two of the free projects in Your First 10 Weekend Builds are made for a new shed: a Bracketed Wall Shelf for the studs and a Slatted Storage Crate for the floor, plus 8 more beginner builds, each with a materials list. Get the free guide →

Maintenance

Each spring and fall, check for loose shingles or trim, open sealant joints, and peeling paint. After big storms, check that the shed hasn’t moved and the anchor cables are tight (Minute Man recommends checking tension periodically where frost is heavy). Keep soil, mulch, and snow off the siding, and oil the hinges and latch once a year.

Build vs. buy an 8×10 shed

A kit or a pre-built shed is faster and needs fewer tools, but you’re limited to the seller’s materials and options, and you still prepare the site, meet local rules, and anchor it. Price this material list locally and compare it with a kit’s price, contents, and delivery. Prefer a single-slope roof? See our lean-to shed plans; we haven’t drawn an 8×10 lean-to.

Next project? Our picnic table plans and chicken coop plans come with full cut lists and printable PDFs too.

Beyond sheds. If you also want ideas for smaller projects, like benches, planters, and shop furniture, TedsWoodworking is a paid plan library. The seller says it bundles over 16,000 plans (the seller’s count; one critic disputes it, see our review). It isn’t made by Shed & Bench, and for a structure like a shed, we’d stick with a plan that shows how it was sized, like this one.

Disclosure: the link below is an affiliate link. If you buy through it, Shed & Bench may earn a commission at no extra cost to you. Affiliate disclosure.

Get the free guide: Your First 10 Weekend Builds

Ten simple, original beginner projects you can build with a drill, a saw, and a couple of clamps, each with a materials list. Sent to your inbox. Unsubscribe anytime. Some emails include clearly labeled affiliate recommendations. See our Privacy Policy.

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

FAQs about 8×10 shed plans

Do I need a permit for an 8×10 shed?

Often not, but ask first. At 80 sq ft it’s under both the 2024 IRC (200 sq ft) and 2024 IBC (120 sq ft) storage-shed exemptions, but local limits, roof-line measuring, setbacks, height limits, and HOA rules still apply.

How much lumber do I need for an 8×10 shed?

For this plan: 49 2x4s (41 of them 8 ft long, the rest longer boards for the wall plates); 10 2×6 x 12 ft for rafters and 7 2×6 x 8 ft for ceiling joists; a 2×8 x 10 ft ridge; 1 2×6 x 10 ft for the door header; 1 2×6 x 8 ft for the window header; and 13 treated boards for the skids and floor. Add 3 floor panels, 5 roof sheathing panels, and 12 siding panels. The full list is above.

What size rafters does an 8×10 shed need?

In this plan, 2×6 No. 2 at 16 in. on center: IRC Table R802.4.1(7) allows at least 7 ft 5 in. at 70 psf ground snow, and this roof spans about 3 ft 11-1/4 in.

Is there a free PDF of these 8×10 shed plans?

Yes, with no email required. It has the materials list, the full cut list, key steps, and all nine diagrams.

Sources

The IRC and IBC text was checked against ICC’s free online viewer (2024 IRC, edition IRC2024V2.0; 2024 IBC, edition IBC2024V1.0). The code links below go straight to ICC’s chapter pages.

All dimensions, cut lengths, and board counts on this page were calculated and cross-checked in code by Shed & Bench.